DESIGN AND DRAWING OF SURPLUS WEIR WITH STEPPED APRON DOWNLOAD

18 Dec design of surplus weir design and drawing of irrigation structures when flood dischrge is known. 14 Nov Surplus weirs are used to dispose of the surplus water from tank to downstream Ø Design of weir. Type D: weir with stepped aprons. Irrigation Design –Drawing. Design and Drawing with all the three views of: Surplus weir with stepped apron; Tank sluice with tower head; Notch type canal drop.

Author: Mezikus Nagor
Country: Ecuador
Language: English (Spanish)
Genre: Career
Published (Last): 8 September 2011
Pages: 480
PDF File Size: 1.2 Mb
ePub File Size: 16.10 Mb
ISBN: 529-6-95490-592-1
Downloads: 96338
Price: Free* [*Free Regsitration Required]
Uploader: Teran

The maximum overturning moment due to water thrust is equal to. Since or any excess water will go out through the surplus weir. Reduced formula for discharge per meter length of weir. Rough stone sloping escapes. Since, temporary regulating arrangements are to be made on top of the weir, to store water at times of necessity, grooved dam stones 15cms design and drawing of surplus weir with stepped apron 15 cms, will be fixed in the centre of the crest at one meter interval with top at MWL.

The weir will have a trapezoidal profile. Generally no aprons are required on the upstream side of the weir but sometimes puddle apron may be provided. So crest width is taken as 1. Reducing the hydraulic slope gradient in a canal if canal water slope is greater than the allowable water slope.

Submersion of foreshore i.

Length of surplus weir: Generally the crest width is assumed as 0. As the water after passing over the weir goes down rapidly to normal M. L The full tank level is the highest level which water could be stored in the tank. Weirs with over one meter width. The slope of weir on either side being the same, the restoring moment M of the weir due to wt.

Hydrology and Irrigation Engineering

The combined catchment area of the group of tanks is 25,89 sq. Tanks in a cascade all have a common supply channel.

Downstream side Wings and Returns. Proper distribution of water carried by a main canal among the branch canals depending upon it.

Weirs with crest width up to one meter. The aprons may be designed for hydraulic gradient 1 in 5 which is within the safety limit and will not start undermining the structure. Collecting sediments at US of structures sand strap. L The maximum water level is higher than full tank level in the water spread design and drawing of surplus weir with stepped apron of the tank for storing the water.

Foundations are about 0. Design a surplus work of a tank forming part of a chain of tanks. Estimation of flood discharge entering the tank: It restricted to store the water up to this maximum water level during rainy days. Since, the dam stones are to be fixed on top at 1 meter clear intervals, the no.

Surplus weirs are used to dispose of the surplus water from tank to downstream channels, downstream or surplus courses, or drainage channels. Posted by vaibhav at Reducing head on design and drawing of surplus weir with stepped apron structures. Providing overall length of 75meters.

| books library

The weir may be assumed as broad crested weir. Therefore, head of discharge over the weir is Stepped apron in two stages is provided. It is also sometimes provided with a nominal rough stone apron 30 cm thick packed well on puddle clay apron. Thursday, 14 November Rectangular Weir. Foundation level is fixed at 9m.

The downstream side wing walls are given a splay of 1 in 5.