GEMCOM MINEX TUTORIAL PDF

Open Pit Scheduling Module In the world of open pit mining, schedules can make the difference between profit and loss. The Gemcom Minex™. Gemcom Minex Tutorial | added by users. David Guetta Sunshine ( David Guetta & Avicii).mp3. Rebel telugu movie free download. Gemcom Software International publishes this documentation for the sole use of Minex licences. Without written permission, you may not sell, reproduce, store in .

Author: Mozahn Mikarg
Country: New Zealand
Language: English (Spanish)
Genre: Art
Published (Last): 28 July 2006
Pages: 177
PDF File Size: 3.83 Mb
ePub File Size: 16.61 Mb
ISBN: 556-9-39758-323-5
Downloads: 45988
Price: Free* [*Free Regsitration Required]
Uploader: Mulmaran

Geometry data is displayed in the Graphics window.

GEOVIA Minex | Geology & Mine Planning – Dassault Systèmes®

Identify the main areas of the Minex interface. GM3 as a secondary file. Click Apply to see the section limits in the graphics window. The red tick indicates the mount that you are currently working with, that is the one on which you are drafting.

Clear Clip underlying data.

GEOVIA Minex™

Text box gemco up and down arrows that you click to move through a set of fixed values. However, you can save time by using the icons on the Section toolbar. How to run a volume calculation with triangles.

Requirements Before proceeding with this tutorial, you should ensure you have the following items: This tutorial uses a set of files contained in a data set that is copied to your computer when Minex6 software is installed. On the left side of the Minex window, click the Filesystems tab.

You can specify the Z elevation value in a text box.

Gemcom minex open_pitscheduling_ds

Arrow associated with a drop-down list. Click in the Name field, type ,inex plan name, for example A1pit10K, and click Ok. Now show the topography and the seams in cross-section. This might indicate that some waste material has been piled around the pit.

Only one of the tabs is active at any time. It usually, but not always, matches the title of the ge,com button that launched it. Geometry data has many uses.

This is useful when you want to start designing again with an empty Graphics window. Right-click the Plan — Create tab and click Save Parameters. Click Dig beside the Y coordinates and then drag a box around the geometry data from bottom left to top right. The object is removed from the Graphics window.

It explains basic concepts that you must understand in order to use the more advanced features of Minex. To show a coordinate grid, click the Section – Coordinate Grid button. Click Query and then click a location, within the Graphics window, in the centre of the geometry data.

Write down or mentally note the X and Y coordinates shown in the Output window.

Gemcom Minex Tutorial — Timbaholic Interaction

They appear on the Graphics 2 tab and the Graphics 3 tab respectively. All you want to do at the moment is to find out the coordinates of a location that is near your data and set your local origin to the same, or similar, coordinates.

If you have changed any files without saving them, you see a prompt to save those files. Volume Calculation Set the triangle volume parameters to calculate volumes between the tops. A words or phrase to which the author wants to give emphasis.

Select the seam SW1. The class of your Minex licence. Create a Weathering Tytorial 3. This technique is useful for reducing the prominence of an object without completely hiding it. In the Graphics window, zoom in to see the annotations on the contours. The distance of the coordinates of your geometry data from the local origin determines the magnitude of the error: When a keystroke is described, the key is shown in this font.

Select the 3D Design tab if it is not already active. This task explains how to set Minex to use a local licence. Holds the settings that you entered into dialogue boxes and wish to keep. Indicates the desired version of Java.